Ground Setup
GROUND: GOUGH WHITLAM PARK
Set up tasks:
Unlock goals from perimeter picket fence and position goals in correct location on goal line.
Fit nets on goals using plastic clips.
Net wraps around posts and crossbar
Insert clip into channel on posts and twist to secure
Back of net wraps under back frame
Use 2 long metal pins in each corner to secure back frame of goal into the ground to prevent tipping of goal posts
Take 3 benches to technical areas: home team, away team and referees.
Rope off entire sideline (side close to Bayview Avenue) using rope reel and pigtail posts fixing each end of rope onto the picket fence.
Unlock emergency vehicle access to main field.